Directors' Report
To,
The members of
Techno Electric & Engineering Company Limited
Your Directors take pleasure in presenting the 20th annual report, along
with the audited accounts of the Company, for the year ended 31 March 2025.
Financial Performance
Brief financial details of its EPC business and Power Generation business are provided
below:
|
|
(Rs. in Lakhs) |
Particulars |
Year ended March 31,2025 |
Year ended March 31,2024 |
Profit before finance cost and depreciation-Continuing Operation |
50,357.86 |
35,835.29 |
Profit before finance cost and depreciation-Discontinued Operation |
5,990.72 |
(345.85) |
Less: Finance Cost |
1,017.19 |
1,641.66 |
Depreciation |
768.88 |
748.04 |
Profit before tax |
54,562.52 |
33,099.74 |
Provision for taxation |
11,752.10 |
6,126.15 |
Profit after taxation |
42,810.42 |
26,973.59 |
Balance brought forward from previous year |
96,172.14 |
72,275.27 |
|
1,38,982.55 |
99,248.86 |
Appropriations |
|
|
Transfer to general reserve |
- |
- |
Final Dividend Paid |
8,140.97 |
6,457.14 |
Transfer from OCI-Re-measurement of defined benefit obligations |
20.31 |
19.78 |
Transfer from OCI on sale of equity share |
(1.15) |
(3,400.20) |
Surplus carried to balance sheet and OCI |
1,30,822.42 |
96,172.14 |
|
1,38,982.55 |
99,248.86 |
Dividend
Your directors have recommended a dividend of Rs.9/- per equity share of nominal value
of XII- each for the financial year 2024-25 subject to the approval of the
Members.
Reserves
Your Directors have not transferred any amount to General Reserve for the year under
review.
Operational Performance
During the year under review, your Company has registered turnover of Rs.2,38,103.53
Lakhs from EPC Business, Rs.1,076.87 Lakhs from the Energy (Power) business and also
earned other operating revenue of Rs.993.20 Lakhs. The profit after tax was at
Rs.42,810.42 Lakhs.
Annual Performance
Details of your Company's annual performance as published on the Company's website and
presented during the Analyst Meet, after declaration of annual results, can be accessed
using the link https://www.techno.co.in/investor/ financials/financial result.
Credit Ratings
During the year under review, the Company has obtained credit ratings from ICRAfor its
short term and long-term facilities as follows.
For brief details of credit ratings refer Report on Corporate Governance.
Share Capital
The paid-up equity share capital as on March 31, 2025, was Rs.23,25,99,148. During the
year under review, the paid-up Equity Share Capital of the Company was increased to
T23,25,99,148 through Qualified Institutional Placement (QIP) of equity shares, the
details of which was already covered in the Directors Report dated August 13, 2024 of the
Financial year 2023-2024,
During the year under review, the Company has not issued any equity shares with
differential rights as to dividend, voting or otherwise.
Projects
During the year 2024-25, the following projects were completed successfully:
1, Procurement of Plant, Design, Supply, Installation, testing & commissioning of
500 kV Arghande (Kabul) Substation of Da Afghanistan Breshna Sherkat,
2, Contract for Engineering, Procurement & Construction of Extension of Kara
Substation & NEW 161/20 KV Substation at Mango in TOGO,
3, Contact for establishment of 2x500MVA, 400/220 kV GIS Substation at Kasargoda &
Extension of 400kV Bays at Udupi,
4, Establishment of New 220/132KV SS at Nangalbibra and associated bays as per RFP and
subsequent amendments issued along with enquiry documents under the Nangalbibra Bongaigang
Transmission Ltd, (NBTL) being executed by Sterlite Power Transmission Ltd.
5, Supply & Service Contract for substation Package SS01 for Construction of
400/220/132kV GIS Substation (New), Mohanlalganj, Lucknow, U.P. (including 125MVAR Bus
Reactor) under "Construction of 400 /220/132kV GIS Substation, Mohanlalganj (Lucknow)
with associated 400kV lines, and other 765kV & 400kV LILO ines at b765kV GIS
Substation Rampur and 400kV LILO (Quad Moose on Monopole) at 400kV GIS Substation Sector
123 Noida" U.P. Intra state through Tariff based Competitive Bidding (TBCB) route,
6, Establishment of new 2X500MVA, 400/220KV Substation atXeldem as per RFP and
subsequent amendments issued along with enquiry documents under the GOA Tamanar
Transmission Project Limited (GTTPL) being executed by Sterlite Power Transmission Limited
(herein after referred as "SPTL")
7, On-Shore Supply, Service and Off-Shore contract for GIS Substation package ASM-SS04
under NER Power System Improvement Project - World Bank Funded: Intra-State-Assam of
PGCIL,
8, Supply & Service contract of 33/11KV Substations, Distribution substations along
with associated lines and related works on turnkey basis in Srinagar circle of UT of Jammu
& Kashmir under prime Minister's Development package (PMDP)
9, Supply & Service Contract for GIS Substation Pkg SS-90: for (i) Extn, of
765/400KV Nizamabad GIS substation including 765kV Bus ducts, Bushing, 400kV GIS bays etc,
under Augmentation of transformation Capacity in Southen Region; (ii) (a) Extn, of
400/230kV Tuticorin- II GIS S/S for Installation of 4th ICT & (b) Extn, of
400/230kV Tuticorin-ll GIS S/S for Installation of 5th ICT Under Transmission
system for Tirunelveli and Tuticorin Wind Energy Zone (Tamil Nadu) (500MW) and (iii) Extn,
of 400kV Nizamabad GIS SS under Consultancy service to TSTRANSCO.
10, Construction of 400/220 KV Sub-Station at Dhardehi (Bilaspur) (upgradation of
existing 220/132 KV substation Dhardehi) on turnkey basis against tender No TR-21/02 (Rfx
No, - 8100022809),
11, Distribution System Improvement: Turnkey contract for Supply & Construction of
New/ Augmentation of 33kV/llkV/LT lines in Tripura-Package III - LOT_l,
12, 765Kv AIS Substation Package - SS108 for Establishment of 765/400/220kV Karnoo
- Ill (New) S/S Including lxl25MVAR, 400kV 3ph Bus Reactor under Transmission Scheme
for Evacuation of power from RE Sources in Karnool Wind Energy Zone (3000 MW)/Solar Energy
Zone (1500 MW) Part-A.
13, Supply of Goods & Service Contract for 765kV AIS (NEW) SS Package SS-01 for
Establishment of 765/400 kV 2xl500MVA at Sikar-ll with 400kV (1x125 MVAR) and 765Kv (2x330
MVAR) bus reactor (Including site levelling and related land development works) associated
with "Transmission system Strengthening for Evacuation of Power from Solar Energy
Zones in Rajasthan (8.1 GW) under Phase-ll Part-C.
14, Supply of Goods & Service Contract for 765kV AIS SS Package SS-01 for Extension
of 765kV Sikar-ll SS associated with "Transmission system Strengthening for
Evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-ll Part-D.
15, Supply, Service & Civil package for design, engineering, manufacturing,
assembly, testing at manufacturer's work, packing & forwarding/dispatch, supply of
material/ equipment, transportation including transit Insurance on FOR site including
Civil Works on BOQ basis for 765kV AIS Bay Extension to establish Inter-State transmission
system for "Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS
under Phase II- Part A Lakadia, Gujarat Project.
16, Supply of Goods & Service Contract for GIS Substation Extension Package SS107
for (i) Extension of 400/220kV Rajgarh SS (Powergrid) Under Transmission system for
providing connectivity to M/s VEEI Jayin Renewables Pvt Ltd (ii) Extension of 765/400kV
Pune, Shikrapur SS (powergrid) under Westen Region Expansion Scheme- XXXI (WRES-XXXI) and
(iii) Extension of 132/66kV Gangtok SS under Eastern Region Expansion Schemes - ERES-XXX
& ERESXXXIII, Spec. No - CC/NT/W-GIS/ DOM/A04/23/00296.
The following projects are on-going and are expected to be completed as per schedule:
1. Supply & Service Contract for SS Pkg SS-03 (Pkg-02) for Turnkey Contract Package
of Design, Manufacturing, Supply, Erection, Testing & Commissioning of 220/33 kV, 50
MVA GIS Substation at Diskit (Nubra) Including staff Quarters
& associated facilities along with 220kV Line Bay at PGCIL's existing GIS SS at
Phyang, associated with Strengthening of Transmission system of LPDD (erstwhile JKPDD)
under PMDP Scheme 15,
2. Supply & Service Contract for Materials/ Equipment/structures/Spares/etc. for
the Construction of 220kV GIS Substation and associated works at Pathanamthitta and Kakkad
on Turnkey basis (Sabari SS Package).
4. Distribution System Improvement: Turnkey contract for Supply & Construction of
New/ Augmentation of 33kV/llkV/LT lines in Tripura-Package III - LOT_2.
5. Distribution System Improvement: Turnkey contract for Supply & Construction of
New/ Augmentation of 33kV/llkV/LT lines in Tripura-Package III - LOT_3.
6. Contract for EPC Package for supply and Installation of Flue Gas Desulphurization
(FGD) System for Kalisindh Thermal Power Project (KaTPP), Unit# 1 & 2 (2X600MW)
Jhalawar, District Jhalawar, Rajasthan, India (Second Contract) for providing three year
Operational & Maintenance service for FGD,
7. Contract for EPC Package for supply and Installation of Flue Gas Desulphurization
(FGD) System for Kota Super Thermal Power Station (KSTPS), Unit# 5 (1X210MW), 6 & 7
(2X195MW) Kota Rajasthan, India (Second Contract) for providing three year Operational
& Maintenance service for FGD,
8. Supply & Service Contract for 220kV GIS Substation Package SS-75: for (i)
Extension of 220kV Drass (GIS) Substation & Extension of 220kV Alusteng (AIS)
Substation under Transmission System Strengthening of Srinagar Leh Transmission System and
(ii) Extension of drass and 66/11KV New Zojila East (GIS) S/S under consultancy service to
NEIDICL.
9. LOA for LOT-B Appointment of Advanced Metering Infrastructure (AMI) Implementing
Agency for smart Metering for 2.5 Lakh Consumers in UT of Jammu & Kashmir on DBFOOT
Basis" issued against RFP No GEM/2022/B/2393485 dated 04.08.2022.
10. Supply of Goods & Service Contract for 400KV New SS Package - SS10T associated
with "Transmission scheme for Solar Energy Zone in Ananthpuram (Ananthapur) (2500 MW)
and Kurnool (1000MW), Andhra Pradesh" through Tariff Based Competitive bidding (TBCB)
route.
11. LOA for" Project Management Consultancy (PMC) services on Lumsum basis which
includes review of engineering, procurement, quality and execution by EPC Contractors,
review of logistics management, review of field quality management, review of health-
safety-environment management, review the progress in obtaining the statutory clearances,
review of reports pertaining to material Inspection & field Inspection by Third Party
Inspector, review of billing & Invoicing management, review of Contract Closure
activities, review of project progress, etc. for establishment of +- 320kV, 1X1000 MW VSC
based EIVDC Scheme in Mumbai.
12. Supply of Goods & Service Contract for SS Package SS01 for (i) 765/400Kv Dausa
New S/s including 400kV class Bus Reactor & Line Reactor and (ii) Extension of 765Kv
Beawar SS associated with Transmission system for evacuation of power from REZ in
Rajasthan (20GW) under Phase-lll-Part-H through tariff based competitive bidding (TBCB)
route.
13. LoA for the appointment of Advanced Metering Infrastructure Service Provider
(AMISP) for Smart Metering on Design Build Finance-Own-Operate-Transfer (DBFOOT) basis
under RDSS scheme.
14. Letter of Intent (LOI) for Supply and Construction of 765KV/400KV AIS substation
along with associated bay extension for "Establishment of Inter-State Transmission
System for evacuation of power from Rajasthan REZ Ph-IV (Part-1) (Bikaner Complex):
Part-B" under Neemrana Transmission Limited (NTL), being awarded to Sterlite Power
Transmission Limited (SPTL).
15. Letter of Award (LOA) for "design, engineering, manufacturing, assembly,
testing at manufacturer's work, packing & forwarding/dispatch, supply of material/
equipment, transportation including transit Insurance on FOR site basis receipt of
material at site, unloading, storage at site, handling at site, erection, testing &
commissioning (ETC) of all the materials/ equipment and auxiliaries in all respect
including Civil works on BOQ basis for 765kV Substation (AIS) at Halvad under TBCB Khavda
Ph-lll-Part-A Project in Gujarat State".
16. LOA for the appointment of Advanced Metering Infrastructure (AMI) Service Provider
for Smart Prepaid Metering in Kashmir power Distribution Corporation Ltd (KPDCL) on DBFOOT
basis issued against Gem bid No GEM/2023/3138132 dtd 15.02.2023.
17. Supply, Erection, Commissioning & Testing of twelve (12) nos, 33/11 KV E-House
substation (Containerized s/s) for developing 11 KV infrastructure at prospective location
in DVC command area and construction of two (2) nos, central Control Room on Turn Key
Basis.
18. Supply and Service Contract for 765KV Substation (New) Package SS-11T for
Establishment of 3xl500MVA (765/400kV), 5x500MVA (400/220KV) station at suitable border
location near Bidar including 400kV, 125MVAR Bus Reactor under "Transmission Scheme
for Solar Energy Zone in Bidar (2500 MW), Karnataka" though Tariff Based Competitive
Bidding (TBCB) route.
19. LOA for the work of appointment of Advanced Metering Infrastructure (AMI) Service
Provider for Smart Prepaid Metering in Ranchi, Medininagar & Hazaribagh Transformer
Metering, Feeder Metering, Feeder Metering and energy accounting under RDSS Scheme
20. LOA for the appointment of Advanced Metering Infrastructure Service Provider
(AMISP) for Smart Prepaid Consumer & system Metering in Tripura State on DBFOOT basis
under Revamped Distribution Sector Scheme (RDSS)
During the year, the Company was successful in bagging the following Orders:
1. Supply of Goods and Service Contract for Augmentation of transformation capacity at
Amargarh (GIS) S/s by lx315MVA, 400/220 kV ICT (3rd) (three single phase units
of 105MVA) along with associated transformer bays along with GIB (420 kV & 245 kV 1-Ph
indoor and outdoor GIB) on LSTK basis NIT dated 21,07,2023
2. LOA of Establishment of Transmission scheme for evacuation of power from Dhule 2 GW
REZ through Tariff based competitive bidding process (TBCB)
3. LOA for Establishment of Western Region Expansion Scheme XXXIII (WRES-XXXIII) Part -
C through Tariff based competitive bidding process (TBCB)
4. Project means the design, engineering, construction, Installation, testing and
commissioning of 2X1500MVA, 765/400KV, 2X500MVA, 400/220kV Substation at Karera along with
LILO of Satna-Gwalior 765kV S/c line at Karera.
5. Procurement of Plant Design, Supply, Delivery, Installation, Testing and
Commissioning of Lot 1: 400kV Ratmate Substation and works at Lapsiphedi and New Hetauda
Substations (MCA-N/ETP/ CB/004A)
6. Procurement of Plant Design, Supply, Delivery, Installation, Testing and
Commissioning of Lot 3: 400kV New Damauli Substation (MCA-N/ETP/CB/004C)
7. LOA for Design, engineering, manufacturing, assembly, testing at manufacturer's
work, packing & forwarding/dispatch, supply of material/equipemnt, transportation
ncluding transit Insurance on FOR site basis receipt of material at site, unloding,
storage at site, handling at site, erection, trsting & commissioning (ETC) of all the
materials/equipment and auxiliaries in all respect including Civil works on BOQ basis for
Augmentation of 400/220kV AIS substations at Lakadia under "Lakadia-RTM" Project
in Gujarat State
8, LOAfor Design, engineering, manufacturing, assembly, testing at manufacturer's work,
packing & forwarding/dispatch, supply of material/equipemnt, transportation including
transit Insurance on FOR site basis receipt of material at site, unloding, storage at
site, handling at site, erection, trsting & commissioning (ETC) of all the
materials/equipment and auxiliaries in all respect including Civil works on BOQ basis for
765kV AIS substations at Lakadia & Bhuj under "Khavda Phase-IV Part-A"
Project in Gujarat State
9, LOA for Construction of 400/220Kv, 2x500 MVA GIS at Sonapur (NEW) along with
associated Transmission Lines (hereafter called "Package H?" and Tender
Reference No - AEGCL/MD/AIIB/PACKAGE- H?/2023/01-H?
10, LOA for Construction of establishment of "north Eastern Region Expansion
Scheme- XVI (NERES-XVI) through tariff Based Competitive bidding process (TBCB)
1,Establishment of New Gogamukh 400/220/132kV substation. 2. Gogamukh (ISTS) -
Gerukamukh (Arunachal Pradesh) 132kV D/c (Zebra)line 3. LILO of one D/c (ckt-1 & ckt-2
of line-1) of Lower Subansiri - Biswanath Chariali 400kV (Twin Lapwing) 2xD/c lines at
Gogamukh S/s
11, Supply of Goods and Services Contract for 765kV AIS Substation Package SS-42T
(forSPV portion) for (a) Establishment of 765/400kV Sirohi including 400kV, 2xl25MV Ar
(3-ph) Bus reactor & 2x80MVAr (3ph)
Line reactor at Sirohi (b) Extn at 765kV Fatehgarh-IV for termination of Fatehgarh- IV
(Section-2) PS - Sirohi PS 765 kV D/c line (c) Extn of 400kV Chittorgarh S/s for
termination of Sirohi PS-Chittorgarh (PG)
400 kV D/c line under Transmission system for evacuation of power from Rajasthan REZ
Ph-IV (Part-2 : 5.5GW) (Jaisalmer/Barmer Complex) Part-B under TBCB route
12. Supply of Goods and Service Contract for Substation Package SS98 for (i)
Construction of New 220/33 kV GIS (NEW) Substation at Nilgrah including 2 nos. of 25MVA,
220/33kV, 3ph ICT and 33kV Switchgears, (ii) LILO of one ckt of Alusteng - Leh 220KV S/c
line on D/c towers at Nilgrah and (iii) Laying of 33KV lines (consists of Overhead line
(OPI) and 33KV underground cable (UG)) under Western Zojila Consultancy work to M/s
NHIDCL., Spec No - CC/NT/W-GIS/DOM/ A04/23/12337
13. LOA for Design, engineering, manufacturing, assembly, testing at manufacturer's
work, packing & forwarding/dispatch, supply of material/equipemnt along with spares
and tools and tackles, transportation including transit Insurance on FOR site basis
receipt of material at site, unloding, storage at
site, handling at site, erection, trsting & commissioning (ETC) of all the
materials/equipment and auxiliaries in all respect ncluding Civil works on LSTK (Lumpsum
Turnkey) basis for Khavda Phase-IV Part-D Transmission scheme includes establishment of a
new Pune-Ill (GIS) S/S and extension of 765Kv SS at Boisar
14. 765kV AIS (New) Package SS-72T (for SPV Portion) for (i) Establishment of
765/400kV, 2x1500 MVA S/s at suitable location near Ghiror (Distt. Mainpuri), (ii)
Extension of Dausa S/s and (iii) Extension of 400kV Firozabad associated with Transmission
system for evacuation of power from Rajasthan REZ Ph- IV (Part-4- 3.5 GW) Part A through
tariff based competitive bidding (TBCB) route.
15. Supply of Goods and Service Contract for 765kV AIS Pkg-SS 63Tfor (i) Establishment
of 765/400kV 4X1500MVA, 400/220kV 4x500 MVA Pooling Station near Davanagere/Chitradurga,
Karnataka with provision of two (2) sections of 4500 MVA each at 400kV level and provision
of four (4) sections of 2500 MVA each at 220kV level associated with Transmission Scheme
for integration of Davanagere/Chitradurga and Bellary REZ in Karnataka,
16, Supply of Goods and Service Contract for 765kV AIS Pkg-SS 65T for Upgradation of
Madhugiri {Tumkur (Vasantnarsapura)} to its rated voltage of 765kV Voltage level under
Scheme "Transmission System for integration of Davanagere/Chitradurga REZ through
tariff based competitive bidding (TBCB) route,
Material Changes and Commitments
No material changes, except the raising of funds through Qualified Institutional
Placement (QIP), have occurred during the financial year of the Company and the same was
covered in the Directors Report dated August 13, 2024,
Significant and material Orders by Regulators
No significant and material orders have been passed by any regulators or courts or
tribunals impacting the going concern status and company's operations in future.
Internal Financial Control and Internal Audit
The Company has adequate internal financial controls in place to manage its affairs,
Proper policies and procedures are adopted by the company for ensuring the orderly and
efficient conduct of its business, including adherence to company's policies, the
safeguarding of its assets, the prevention and detection of frauds and errors, the
accuracy and completeness of the accounting records, and the timely preparation of
reliable financial information and the same is reviewed at regular intervals depending
upon the situation of the business of the Company,
To maintain its objectivity and independence, the Internal Audit function reports
directly to the Chairman of the Audit Committee and present their observations before the
Audit Committee,
The Internal Audit team monitors and evaluates the efficacy and adequacy of internal
control systems in the Company, its compliance with operating systems, accounting
procedures and policies at all locations of the Company and its subsidiaries, Based on the
report of internal audit function, process owners undertake corrective action(s) in their
respective area(s) and thereby strengthen the controls,
The Audit Committee reviews the reports submitted by the Internal Auditors in its
quarterly meetings.
Subsidiaries/Associates/Joint Ventures:
Material Subsidiary
Your Company doesn't have any material subsidiary in the year under review.
Non-material Subsidiary and Associates
Your company has the following non-material non-listed subsidiaries namely:
Techno Infra Developers Private Limited;
Techno Digital Infra Private Limited;
Techno Digital Infra 2 Private Limited (Formerly; Techno Wind Power Private Limited);
Techno Data Center Limited;
Rajgarh Agro Products Limited;
Techno AMI Solutions Private Limited;
Techno AMI Solutions 1 Private Limited;
Techno AMI Solutions 2 Private Limited;
Techno AMI Solutions 3 Private Limited;
Techno AMI Solutions 4 Private Limited;
Techno Electric Overseas Pte, Limited;
NERES XVI Power Transmission Limited; (w.e.f, 30.05.2024)
NERGS-I Power Transmission Limited; (w.e.f, 30.06.2024)
Techno Digital Infra 1 Private Limited; (w.e.f, 26.09.2024)
Techno Green Energy Private Limited (Subsidiary till 26,11.2024)
Your company doesn't have any associate or joint venture companies within the meaning
of Section 2(6) of the Companies Act, 2013 ("Act") as on March 31, 2025, There
has been no material change in the nature of the business of the subsidiaries during the
year under review, except M/s, Techno Wind Power Private Limited, whose nature of business
was changed to development of digital infrastructure and the name was also changed
accordingly,
Pursuant to the provisions of Section 129(3) of the Act, a statement containing the
salient features of financial statements of the Company's subsidiaries in Form No, AOC-1
is attached to the financial statements.
The Annual Reports of the subsidiary companies are not attached to the Annual report,
However, the same is available at the Corporate Office of the Company for inspection by
members during working hours and also available at the website of the Company at https://www,techno,coin/
investor/financials/financial result. Relevant financial information of the
Subsidiaries has been disclosed in this Annual Report as required
Outlook and Opportunities Power Sector:
Alongside a continued need for conventional power generation, the future of India's
power sector is trending towards increased reliance on renewable energy sources. India is
aiming for a significant increase in non-fossil fuel-based power capacity, targeting 500
GW by 2030.
This transition is driven by government policies, private investment, and the need to
address climate change.
While the share of fossil fuel-based power is declining, coal-based power plants remain
crucial for ensuring a stable and reliable energy supply, especially given the projected
increase in electricity demand. Solar and wind power generation are experiencing
substantial growth, with India committed to installing 50 GW of non-fossil fuel capacity
annually, Nuclear power
generation is also increasing, contributing to the diversification of the energy mix.
India is expected to attract substantial investments in the renewable energy sector, with
estimates reaching billions of dollars. Integrating advanced technologies like Artificial
Intelligence (Al),
Internet of Things (loT) and smart grids is crucia for managing the increasing
complexity of the power system, especially with the integration of renewable energy
sources, The is revolutionising the power sector by enhancing efficiency, reliability, and
sustainability across the entire energy value chain,
India's electricity demand is projected to increase significantly, requiring
substantial investments in both conventional and renewable energy sources to meet the
growing needs of a rapidly developing economy, Energy storage solutions, such as
batteries, will play a vital role in integrating renewable energy sources and ensuring
grid stability, A skilled and adaptable workforce is essential for managing the evolving
power sector, requiring training and development programmes aligned with the future needs
of the industry.
Advanced Metering Solutions:
The smart metering sector in India is poised for significant growth, driven by
government initiatives, increasing energy demand, and the need for efficient energy
management.
The market is expected to grow and expand rapidly. This growth is fuelled by the
adoption of advanced metering infrastructure (AMI), prepaid smart meters, and the
Integration of Internet of Things (loT) and data analytics.
The Indian government is actively promoting smart grid development and the adoption of
smart meters as part of its digitalization and energy efficiency goals. Rising electricity
consumption, particularly in urban areas, necessitates more efficient and intelligent
energy management systems. Smart meters are crucial for modernising the grid, enabling
better load management, reducing power theft, and improving overall grid stability,
Growing awareness among consumers about the benefits
of smart meters, such as transparent billing, real-time monitoring, and potential cost
savings, is driving adoption, Integration of loT, data analytics, and Al is enhancing the
functionality and efficiency of smart meters, making them more sophisticated and
user-friendly, Smart metering is a key component of smart city development, contributing
to the overall efficiency and sustainability of urban infrastructure. The adoption of AMI
technology is expected to increase significantly, driven by the need for real-time data
analytics and efficient energy management. The demand for prepaid smart meters is
projected to grow, offering consumers more control over their energy usage and providing
flexible payment options, Smart meters are generating vast amounts of data that can be
analysed to improve energy consumption patterns, optimise grid operations, and identify
potential areas for energy savings, Cybersecurity is a major consideration, and smart
meters are being designed with robust encryption and security protocols to protect against
data breaches and unauthorised access, Smart meters will play a vital role in integrating
renewable energy sources into the grid, enabling efficient management of fluctuating
energy production,
Ensuring that smart meters and the associated infrastructure are compatible and
adaptable to future technological advancements is crucial, Maintaining reliable
communication networks for real-time data transmission is essential for the smooth
functioning of smart metering systems. Establishing clear standards for smart meter
technology and data communication protocols is important to avoid vendor lock-in and
ensure interoperability, Educating consumers about the benefits and proper usage of smart
meters is vital for maximising their adoption and impact, Training and developing a
skilled workforce to manage and maintain the smart metering infrastructure is essential
for its successful deployment,
Overall, the smart metering market in India is on a trajectory of rapid growth and
transformation. The increasing adoption of smart meters is expected to revolutionise
energy management, improve grid efficiency, and empower consumers to manage their energy
consumption more effectively. Being one of the distinct player in AMI segment, Techno is
well placed now for future opportunities.
Data Center:
India's data centre market is experiencing rapid growth and is poised for significant
expansion in the coming years, driven by factors like increased data consumption, the
adoption of Al and cloud computing, and government initiatives promoting digitalisation.
The proliferation of digital content, e-commerce, and online services is leading to a
surge in data creation and storage needs. The growing adoption of Al, including machine
learning and deep learning, is creating a high demand for data processing and storage
capabilities, further boosting the data center market. The shift towards cloud-based
solutions by businesses and individuals is also contributing to the increased demand for
data center infrastructure. Supportive policies and the designation of data centres as
infrastructure are facilitating investments and expansion in the sector. The emphasis on
data localisation, driven by data privacy and security concerns, is also a key factor in
the growth of the domestic data center market.
Data center operators are increasingly focusing on sustainable practices, including the
use of renewable energy and water recycling, to reduce their environmental impact, The
industry is witnessing advancements in areas like energy- efficient solutions,
hyper-converged infrastructure, and high-density rack space to meet the evolving needs of
Al and other technologies, A significant amount of investment is expected in the coming
years to expand data center capacity and capabilities,
The data center market is becoming more competitive, with operators focusing on
providing advanced infrastructure and sustainable solutions to attract clients, Even
though Techno is a new player in this segment, but we believe and ambitious to have a
strong footing in this segment.
Listing of shares
The equity shares of the Company are listed with BSE Limited (Code: 542141) and the
National Stock Exchange of India Limited (Symbol: TECHNOE)
Directors
As on March 31, 2025, the Board consisted of Six ndependent (Non-Executive) Directors
including one Woman Independent Director, One Managing Director (Executive), One
Whole-time Director (Executive), One Non-Independent Woman Director (Non-Executive) and
Two Professional Directors (Non-Executive),
Appointment/ Reappointment/Resignation of Director
Mr. Shailesh Kumar Mishra:
During the year under review, the designation of Mr, Shailesh Kumar Mishra
(DIN:08068256) was changed to Non-Executive Director in Professional capacity on June 28,
2024 by the Board on recommendation of Nomination & Remuneration Committee and
approval of the Members of the
Company was obtained in the Annual General Meeting held on September 26, 2024.
In accordance with the requirements of the Act and the Company's Articles of
Association, Mr. Shailesh Kumar Mishra (DIN:08068256), Non-Executive Non-Independent
Director is liable to retire by rotation at the ensuing Annual General Meeting and seeking
re-appointment by the shareholders. The resolution seeking Members' approval for his
reappointment forms part of the Notice. A brief profile of Mr. Shailesh Kumar Mishra is
given below:
Brief Profile
Mr. Shailesh Kumar Mishra aged about 61 years residing at A702, Time Residency, Sector
- 63, Gurugram, Haryana - 122011. He has more than 40 years of experience in Power Sector.
Qualification:
Bachelor in Electrical Engineering from NIT, Bhopal in 1985;
Certified Energy Auditor from Bureau of Energy Efficiency in 2012.
Professional Experience:
Name of Organization |
Position held and Nature of Duties |
PowerGrid Himachal Transmission Ltd. |
Chief Executive Officer (CEO) |
PowerGrid Corporation of |
Director (Power Systems) |
India Ltd, |
Responsible as Board Memberfor discharging day to day company affairs.
Team leader, for design, Installation and commissioning of large renewable plants along
with energy storage as capex project, calling and award of tenders for attracting
investors for Solar, onshore/ offshore wind, Floating Solar, Solar- Wind Storage Hybrid,
standalone Battery Energy Storage System on BOO basis. Business Development and
interaction closely with Central Transmission Utility/ CEA/ CERC/ MOP/ MNRE for Policy,
Planning matters and resolution of issues related to RE Projects. |
|
Member of key panels for transmission planning for evacuation of 500
GW renewable projects, finalisation of bidding guidelines for renewable projects, detailed
study of renewable integration and finalising the minimum technical requirements for
connecting renewable projects to National Grid. |
PowerGrid Corporation of |
Executive Director (QA&I and CMD Coordination Cell), Corporate
Centre. |
India Ltd, |
Overall supervision of all functions of Company in installation of
765/400/220 Kv transmission system (Projects Management., Operations, Commercial, Quality
Assurance and Inspection). |
Name of Organization |
Position held and Nature of Duties |
PowerGrid Corporation of |
General Manager |
India Ltd, |
Worked in various capacities and handled Quality Assurance &
Inspection, Transmission Project Execution & Monitoring along with Operation &
Maintenance, Actively associated in implementing all new technologies SVC/ TCSC/STATCOM/
HVDC, |
NTPC Ltd, |
Sr, Engineer Construction, Operation and Maintenance of 400/220
KVTransmission Assets. |
Mr. Arun Duggal:
The appointment of Mr, Arun Duggal was already reported in last year, However, since it
was happened in last financial year, a brief summary is presented in this report as
follows:
Based on recommendation of Nomination & Remuneration Committee, and the Board and
in accordance with the provisions of the Act and Listing Regulations, Mr, Arun Dugga (DIN:
00024262) was appointed as Additional Independent Director by the Board on August 13,2024
for a term of 5 years and the approval of Members was obtained for the said appointment of
Mr, Duggal as an Independent Director by a Specia Resolution at the Annual General Meeting
held on September 26, 2024 i.e. within the stipulated time.
Mr. Ankit Saraiya
Mr, Ankit Saraiya, Whole-time Director was designated as Chief Executive Officer (CEO)
of the Company by the Board of Directors, on recommendation of the Nomination and
Remuneration Committee on April 05, 2025,
Cessation of Directors
During the financial year, there has been no cessation of any director in the Company.
Key Managerial Personnel
Pursuant to Section 203 of the Companies Act, 2013, the Key Managerial Personnel of the
Company are -
Mr. Padam Prakash Gupta, Managing Director;
Mr. Ankit Saraiya, Whole-time Director & CEO;
Mr. Pradeep Kumar Lohia, Chief Financial Officer;
Mr. Niranjan Brahma, Company Secretary and Compliance Officer,
Declaration by Independent Directors
The Company has received Statement on declaration from each independent director under
Section 149(7) of the Companies Act, 2013, that they meet the criteria of independence
laid down in Section 149(6) of the Companies Act, 2013 and Regulation 25 of Securities and
Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations,
2015,
The declaration is attached with the report as a separate annexure.
In the opinion of the Board, there has been no change in the circumstances which may
affect their status as Independent Directors of the Company and the Board is satisfied of
the integrity, expertise and experience (including proficiency in terms of Section 150(1)
of the Act and applicable rules thereunder) of all Independent Directors on the Board.
Meetings of Directors Board Meeting
During the year 2024-25, Four meetings of the Board of Directors of the Company were
held. The details of the meetings of the board are available in the corporate governance
report, which forms part of this report.
The maximum interval between any two meetings did not exceed 120 days, as prescribed by
the Act and the SEBI Listing Regulations,
Independent Directors' Meeting
The Independent Directors of the Company had met on March 28, 2025 to review the
performance of non-independent directors and the Chairperson of the Company, including
overall assessment on the effectiveness of the Board in performing its duties and
responsibilities, The Board comprises Members who have expertise in Technical, Banking and
Finance,
The Directors evaluate their performance and contribution at every Board and Committee
Meetings based on their knowledge, experience and expertise on relevant field vis-s-vis
the business of the Company,
Annual Evaluation of Board Performance and performance of its Committees and Individual
Directors
SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, mandates that
the Board shall monitor and review the Board evaluation framework, The Companies Act, 2013
states that a formal annual evaluation needs to be made by the Board of its own
performance and that of its committees and individual directors. Schedule IV of the
Companies Act, 2013 states that the performance evaluation of independent directors shall
be done by the entire Board of Directors, excluding the director being evaluated.
The board of directors has carried out an annual evaluation of its own performance,
board committees and individual directors pursuant to the provisions of the Act and the
corporate governance requirements as prescribed by Securities and Exchange Board of India
(Listing Obligations and Disclosure Requirements), Regulations 2015 ("SEBI Listing
Regulations"),
In a separate meeting of independent directors, performance of non-independent
directors, performance of the board as a whole and performance of the chairman was
evaluated, considering the views of executive directors and non-executive directors. The
same was discussed in the board meeting that followed the meeting of the independent
directors, at which the performance of the board was also discussed. Performance
evaluation of independent directors was done by the entire board, excluding the
independent director being evaluated and the performance of the Board, its committees and
individual Directors was discussed,
Policy on Board Diversity and Director Attributes and Remuneration Policy for
Directors, Key Managerial Personnel and Other Employees
In terms of the provisions of Section 178(3) of the Act and Regulation 19 read with
Part D of Schedule II to the Listing Regulations, the Nomination and Remuneration
Committee (NRC) is responsible for determining qualification, positive attributes and
independence of a Director, The NRC has formulated the policy and recommend to the Board,
the remuneration of the Directors, KMP etc.
In line with this requirement, the Board has adopted policy on Board Diversity and
Director Attributes and Remuneration Policy for Directors, KMP etc, of the Company, is
available on Company's website at https://www.techno.co.in/ investor/codes and policies.
Familiarisation Programme for Directors
All Board Members of the Company are accorded every opportunity to familiarise
themselves with the Company, its management, its operations and above all, the industry
perspective and issues,
For details of familiarisation programme refer the Report on Corporate Governance,
Nomination and Remuneration of Directors
The Nomination and Remuneration Committee of the Board comprises three directors as its
members with one independent director as its Chairperson, It has formulated the policy for
appointments of Directors and Key Managerial Personnel and determination of remuneration
including the criteria for determining qualification, positive attributes independence of
a director and other matters as provided under sub-section (3) of section 178 of the
Companies Act, 2013, In terms of the Policy, the non-executive directors and the
independent directors shall not receive any remuneration, except the sitting fees for
attending meetings of the Board and its Committees.
The details of the committee including its role and responsibilities are given in the
Corporate Governance Report,
Corporate Social Responsibility (CSR)
The Company has in place a Corporate Social Responsibility (CSR) Committee comprising
of three independent directors and one non-executive director, The Committee acts as per
the CSR policy which provides guidelines to conduct CSR activities of the Company, The CSR
policy is available on the website of the Company at https://www,techno,
co.in/investor/codes and policies. During the year, the Company was supposed to spend
Rs.545,60 lakhs, It had allocated Rs.548,20 lakhs and spent Rs.518,90 lakhs towards CSR
projects and transferred Rs.44,50 lakhs to the Unspent CSR Account opened with ICICI Bank,
relating to the ongoing projects, including Rs.26,70 lakhs towards provision for cost
escalation. The statement on CSR activities, in terms of Section 135 of the Companies Act,
2013, is annexed to this report.
Risk Management
The Company has a Risk Management Committee comprising of three directors. The purpose
of risk management committee of the Board is to assist the Board in fulfilling its
corporate governance oversight responsibilities with regard to the identification,
evaluation and mitigation of operational, strategic and externa environmental risks. The
committee has overall responsibility for monitoring and approving the risk policies and
associated practices of the company and also formulated the Risk Management Policy which
is available at the Company's website at https://www.techno.co.in/ investor/codes and
policies
The risk management committee is also responsible for reviewing and approving risk
disclosure statements in any public documents or disclosures, The details of the committee
including its role and responsibilities and meetings, are given in the Corporate
Governance Report,
Vigil Mechanism
The Company has established the vigil mechanism as per Companies (Meetings of Board and
its Powers) Rules, 2014, that provides a formal mechanism for all Directors, employees and
vendors and make protective disclosures about unethical behaviour, actual or suspected
fraud or violation of the Company. The Vigil Mechanism comprises the Whistleblower policy
which intends to cover serious concerns that could have grave impact on the operations and
performance of the business of the Company. The policy neither releases employees from
their duty of confidentiality in the course of their work, nor can it be used as a route
for raising malicious or unfounded allegations against people in authority and/or
colleagues in general. The Whistleblower policy is available at the Company's website at https://www.
techno.co.in/investor/codes and policies
Audit Committee
The Company has an Audit Committee in place with three independent directors and one
non-independent director as its members. One independent director is the Chairperson of
the Committee. The details of the committee Including its role and responsibilities are
given in the Corporate Governance Report.
Stakeholders Relationship Committee
The Company has in place a Stakeholders Relationship Committee comprising of three
directors with one independent director as its Chairperson. The Committee meets once in
every quarter to look after the Grievances of Stakeholders. The Company is also registered
with SCORES (the investor compliant/grievance platform), to facilitate the stakeholders to
register their complaints/grievances.
The details of the committee including its role and responsibilities are given in the
Corporate Governance Report.
Dividend Distribution Policy
In terms of Regulation 43A of the Listing Regulations, the Company has in place a
dividend distribution policy. The object of the policy is to share profit of the Company
with the shareholders appropriately and to ensure funds are available for the growth of
the Company. The policy inter alia describes the circumstances under which the
shareholders may or may not expect dividend, the financial parameters that shall be
considered while declaring dividend, internal and external factors that shall be
considered for declaration of dividend, policy for utilization of retained earnings and
the parameters with respect to different classes of shares for declaration of dividend.
The said policy is available at the Company's website at https://
www.techno.co.in/investor/codes and policies.
Directors' Responsibility Statement
Pursuant to Section 134(5) of the Act, the Board of Directors, to the best of its
knowledge and ability, confirm that:
a) That in the preparation of the annual accounts, the applicable Accounting Standards
were followed, along with proper explanation relating to material departures:
b) That the selected accounting policies are reasonable and prudent so as to give a
true and fair view of the Company's state of affairs and profit at the end of the
financial year, and applied them consistently;
c) That proper and sufficient care was taken for maintenance of adequate accounting
records in accordance with the provisions of the Companies Act, 2013, for safeguarding the
Company's assets and for preventing and detecting fraud and other irregularities;
d) That the accounts for the period ended March 31, 2025 is on a going-concern basis.
e) That proper internal financial control has been laid down and followed by the
company and that such internal financial controls are adequate and are operating
effectively.
f) That proper system has been devised to ensure compliance with the provisions of all
applicable laws and that such systems were adequate and operating effectively.
Deposits
The Company has not accepted any deposits from public or others during the year under
Sections 73 to 76 of the Companies Act, 2013 read with The Companies (Acceptance of
Deposits) Rule, 2014.
Auditors
Statutory Auditor and Statutory Auditors' Report
At the 17th Annual General Meeting held on September 26, 2022 the Members
approved the appointment of M/s. Walker Chandiok & Co. LLP, Chartered Accountants,
(Firm Registration No. 001076N/N500013) as the Statutory Auditors of the Company for a
term of 5 years commencing from the conclusion of the 17th Annual General
Meeting till the conclusion of the Annual General Meeting to be held in the year 2027.
The standalone and consolidated financia statements of the Company have been prepared
in accordance with Ind AS notified under Section 133 of the Act and audited by the
Auditors.
The Statutory Auditor's Report does not contain any qualifications, reservations,
adverse remarks or disclaimers. The Statutory Auditors of the Company have not reported
any fraud to the Audit Committee of Directors as specified under Section 143(12) of the
Act, during the year under review.
The Statutory Auditors were present in the last Annual General Meeting
Secretarial Auditor and Secretarial Compliance Report
M/s. Babulal Patni, Practicing Company Secretaries (CP No. 1321 and PR No. 1455/2021),
was appointed as the Secretarial Auditor of the Company who had carried out the
Secretarial Audit for the FY2024-25 and issued the Secretarial Compliance Report. The
Secretarial Compliance Report confirms that the Company has complied with the provisions
of the Act, Rules, Regulations and Guidelines and there were no deviations or
non-compliances. The Secretarial Compliance Report is provided as Annexure-lll to this
Report, The Secretarial Compliance Report does not contain any qualifications,
reservations or adverse remarks or disclaimers,
The Board of Directors at their meeting held on May 27, 2025 have appointed M/s,
Babulal Patni, Practicing Company Secretaries (CP No. 1321) and a Peer Reviewed Company
Secretary, for a period of 5 consecutive years, commencing from the FY 2025- 26 to FY
2029-30, and recommended the said appointment to the shareholders for approval at the
ensuing Annual General Meeting, The appointment, role and responsibility of the
Secretarial Auditor shall be compliance with the provisions of Section 204 of the
Companies Act, 2013 read with the Companies (Appointment and Remuneration of Manageria
Personnel) Rules, 2014 and the amended Regulation 24A of the Listing Regulations, They
have confirmed that their appointment complies with the eligibility criteria in terms of
Listing Regulations, The resolution seeking Members' approval for their appointment forms
part of the Notice,
Cost Auditors and Cost Audit Report
In terms of Section 148 of the Act, the Company is required to have the audit of its
cost records conducted by a Cost Accountant of its energy (power) division, The Board of
Directors of the Company had appointed Mr, Saibal Sekhar Kundu, Cost & Management
Accountant (Membership No,9379), as the cost auditors of the Company on the recommendation
of the Audit Committee.
In accordance with the provisions of Section 148(3) of the Act read with Rule 14 of the
Companies (Audit and Auditors) Rules, 2014, the remuneration payable to the Cost Auditors
as recommended by the Audit Committee and approved by the Board has to be ratified by the
members of the Company
The Cost Audit for the year under review be conducted on time and the Report for the
year ended March 31, 2025 will be forwarded to the Central Government within the statutory
time limit.
Annual Return
The Annual Return of the Company as on March 31, 2025 in the prescribed Form is
available on the website of the Company at https://www.
techno.co.in/investor/securities/share.
Investor Education and Protection Fund (IEPF)
During the year under review, no unpaid dividend and/or shares were due for transfer to
the Investor Education & Protection Fund.
Particulars of Employees and Remuneration
During the year, no employee of the company was in receipt of remuneration of or in
excess of the amount prescribed under the Companies Act, 2013. Disclosures pertaining to
remuneration and other details as required under Section 197(12) of the Companies Act,
2013, read with Rule 5(1) of the Companies (Appointment and Remuneration of Managerial
Personnel) Rules, 2014 are annexed to this report.
Business Responsibility and Sustainability Report (BRSR)
In accordance with Regulation 34(2)(f) of the Listing Regulations, the BRSR, covering
disclosures on the Company's performance on Environment, Social and Governance parameters
for FY2024-25 in the prescribed format, is annexed and forms an integral part of the
annual report.
The BRSR indicates the Company's performance against the principles of the 'National
Guidelines on Responsible Business Conduct' (NGRBC). This would enable the Members to have
an insight into Environmental, Social and Governance initiatives of the Company.
The Integrated Report communicates your Company's performance on financial and non-
financial aspects to all stakeholders, underlying the priority of our leadership and
strategy towards value creation as well as commitment to a more sustainable future with
low-carbon smart energy solutions giving more power to you. Our commitment to Environment,
Social and Governance (ESG) is available in our website https://www.techno.co.in/sustainabilitv/
environment.
Report on Corporate Governance
Pursuant to Regulation 34 of the Listing Regulations, the Report on Corporate
Governance along with the Certificate from Mr, Amarendra Kumar Rai, Proprietor, Amarendra
Rai & Associates, Membership No, F8575, C.P. No,9373, Practicing Company Secretary
confirming compliance with the requirements of the Corporate Governance is annexed to this
report,
Particulars of Loans, Guarantees and Investment
The loans given or guarantee provided by the Company for loans taken by others are
within the limits prescribed under Section 186 of the Companies Act, 2013 and have not
made any inter-corporate investments beyond the limits prescribed under the aforesaid
section during the year, The loans were normally given to Special Purpose Vehicle (SPV)
companies in the ordinary course of business during the year under review.
Particulars of Contracts or Arrangements with Related Parties:
The Company has entered into contracts or arrangements with its Related Parties mainly
Special Purpose Vehicle (SPV) companies and Subsidiaries in the ordinary course of
business during the year under review in compliance with the guidelines of its Policy, the
Act,
Listing Regulations and applicable Accounting Standards. The statement of transactions
with related parties was placed before the Audit Committee and the Board on quarterly
intervals and approval taken. The business transactions entered into with the related
parties have been disclosed, if applicable in the notes to the annua accounts which form
part of the Annual Report.
Disclosure as per The Sexual Harassment of Women at Workplace (Prevention, Prohibition
and Redressal) Act, 2013
The Company has zero tolerance towards sexual harassment at the workplace and has
adopted a policy on prevention, prohibition and redressal of sexual harassment at
workplace in line with the provisions of the Sexual Harassment of Women at Workplace
(Prevention, Prohibition and Redressal) Act, 2013 and the Rules thereunder. The said
policy is available at the website of the Company https://
www.techno.co.in/investor/codes and policies,
There was a committee called POSH Committee is in place with the members viz,, Ms.
Avantika Gupta, Non-Executive Director as Chairperson,
Mr, Ramesh Chandra Agarwal, Executive Director (Mechanical), Mr, Ajay Khajuria, Asst,
Vice President & CHRO, Ms, Moumita Som, Dy, Manager (HR), as internal Members with
one Independent External Member Ms, Shahida Hussain, who was the consultant on POSH, The
role of the POSH Committee is to look after the complaints and for prevention and
redressal of the grievances relating to sexual harassment, No compliant was received
during the year under review, The Company had organised 4 Awareness workshop during the
calendar year 2024 that was attended by 238 employees. The Committee also submitted its
Annual Report with relevant Authorities in compliance with Section 21(1) of Sexual
Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013.
As it was required to reconstitute the Committee every 3 years, it was, therefore
reconstituted by the Board on February 11, 2025 with members viz., Ms. Avantika Gupta,
Non-Executive Director as Chairperson, Mr. Sheikh Anoar Ali, President (Business
Development), Ms. Shivani Chandok, Vice President (Strategic Initiative), Ms. Avirupa
Saha, Senior Manager (HR) as Members and Ms. Malika Singh as Member (External).
Status of complaints as on March 31, 2025:
Particulars |
Number of Complaints |
(a) No, of complaints of received during the financial year |
Nil |
(b) No, of complaints disposed off during the financial year |
Nil |
(c) No, of cases pending for more than 90 days |
Nil |
(d) No, of complaints Pending at the end of thefinancial year |
Nil |
Compliance with Maternity Benefit Act
The Company is in compliance with the inter- alia the requirements of The Maternity
Benefit (Amendment) Act, 2017.
1. Maternity Leave of 26 weeks and in unfortunate event of a miscarriage, a female
employee shall be entitled to 12 weeks of leave, provided such leave applications shall be
supported by a medical report from treating registered medical practitioner,
2. Special Maternity Leave of 12 weeks may be granted for adoption of a child under the
age of 3 months, provided the application for such leave shall be supported by the
necessary documents.
3. Maternity/Miscarriage/Special Maternity leave cannot be accumulated or encashed.
Management Discussion and Analysis
A management discussion and analysis report as required by the Securities and Exchange
Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015
(Listing Regulations) is annexed and forms an integral part of the annual report.
Secretarial Standards
The Company has in place proper systems to ensure compliance with the provisions of the
applicable Secretarial Standards issued by The Institute of Company Secretaries of India
and such systems are adequate and operating effectively.
General
Your Directors state that no disclosure or reporting is required in respect of the
following matters as there were no transactions on these matters during the year under
review:
i. Details relating to deposits covered under Chapter V of the Companies Act, 2013.
ii. Issue of equity shares with differential rights as to dividend, voting or
otherwise.
iii. Issue of shares (including sweat equity shares) to employees of the Company under
any scheme or any stock options scheme.
iv. Neither the Managing Director nor the Whole-time Directors of the Company receive
any remuneration or commission from any of its subsidiaries.
v. No significant or material orders were passed by the Regulators or Courts or
Tribunals which impact the going concern status and Company's operations in future.
vi. The Statutory, Secretarial and Cost Auditors have not reported to the Audit
Committee, under Section 143(12) of the Companies Act, 2013 any instances of fraud
committed against the Company by its officers or employees, the details of which need to
be mentioned in the Board's report.
vii. There has been no change in the nature of business of the Company.
viii. There is no proceeding pending under the Insolvency and Bankruptcy Code, 2016.
ix. There was no instance of onetime settlement with any Bank or Financial Institution.
Acknowledgements
Your Directors wish to express their gratitude to the stakeholders, various customers
and their consultants, different government departments and the Company's bankers for
their continued support to the Company. The Directors look forward to their support in
future.
For and on behalf of the Board of Directors |
|
Place: Kolkata, |
(P. P. Gupta) |
Date: August 12, 2025 |
Chairman |
|